FOR PLANT MANAGERS AND SME OPERATIONS TEAMS

6 Excel templates to organise your factory, without expensive software.

Factory Pack: 6 Excel templates with a filled-in example and guides in English and Spanish. A 90-day plan, KPI dashboard, line or machine costing, preventive maintenance, SMED and capacity. Practical plant routines, ready to open and use.

59 € one-time payment, no subscription.
Maintenance
Organise preventive maintenance with an equipment list, calendar and breakdown log.
Production and costing
Review a KPI dashboard, line or machine costs and capacity to find the bottleneck.
Continuous improvement
Use a 90-day plan and SMED to organise changeovers and actions with an owner and date.

Editable Excel files. Download immediately after payment on Payhip. See the 6 individual templates.

Three specialities, one goal: your result.

Our strength comes from the synergy between industrial method, quality rigour and construction control.

Industry Quality Construction e2b Measurable Results

Industry & Processes

We apply efficiency and continuous improvement methods to optimise your operations, cut costs and eliminate waste.

Quality & Compliance

We help you standardise and meet the regulations (ISO, GxP) your customers demand, without unnecessary bureaucracy.

Architecture & Construction

We bring economic and management control to your works and projects, ensuring profitability and on-time delivery.

Our Lines of Action

Four complementary focuses to improve with method. Pick where to start and get tangible results.

Industrial Method & Digitalisation

Ideal for:

Production SMEs, workshops, builders and services looking for control and efficiency.

What it solves:

  • No visibility of real profitability.
  • Decisions without data.
  • Manual processes with errors.

Vivienda 5.0

Ideal for:

Homeowners or renovators looking for efficiency, comfort and self-generation.

What it solves:

  • Uncontrolled energy consumption.
  • Lack of home-automation integration.
  • Projects without measured return.

Related solutions:

▶️ Kit: Energy Check Pack

Practical kits with industrial DNA.

Results in days, not months. Ideal for those who want better control without complex software or expensive consultants.

Prefer to do it with us?

We help you with method, data and real experience. No empty reports or technical jargon, just results.

Deliverables: 90/180-day plan, action board, KPIs and support.

COMING SOON

Practical Training for your Team.

We are preparing courses and workshops to train your team in continuous improvement, cost control and quality management. Real tools, applied to your day to day.

From our Blog

Practical guides to measure better, decide with data and execute with method. (Articles in Spanish for now.)

Tool applications

We apply the same method in factory, workshop or site. These are some transformation examples.

Application: Local Builder

Control

Margin Increase

Organise budgets, costs and project reviews.

See related Kit

Application: Mechanical Workshop

Stock

Stock Errors

Record inventory and review critical components.

See related Kit

Application: Components Factory

OEE

Efficiency (OEE)

Measure availability, performance and quality to prioritise losses.

See Service

Application: Energy Company

Energy

Electricity Consumption

Compare consumption and assess measures using actual data.

See related Kit

Illustrative applications, not documented customer results.

How do you want to start

Kits

Download and use it today.

€

  • Excel + Guide + Dashboard
  • Free demo

RECOMMENDED

Express Diagnostic

90-day plan in 3 working sessions.

€€

  • Sessions with your team
  • 90/180-day roadmap
  • KPIs and quick wins

90/180 Projects

Full implementation and follow-up.

€€€

  • Implementation and training
  • Monthly KPI review
  • Scaling and standardisation

One team, three complementary visions.

Our strength is the union of process engineering, architecture vision and quality rigour. We translate complexity into solutions that work.

Avatar of Javier M. González Photo coming soon

Javier M. González

Engineering & Processes

Over 10 years improving operations in energy, pharma and aero industrial plants. He brings the method, the data and the efficiency focus so every solution is measurable and scalable.

LinkedIn

Avatar of Mauricio Núñez Photo coming soon

Mauricio Núñez

Architecture & Construction

Experience executing projects and works. He ensures the tools are practical, visual and fit the reality of the sector.

Avatar of Amalia Martín Photo coming soon

Amalia Martín

Quality & Audits

Supports review of regulations and management systems. Each kit must be adapted and checked for its intended use.

Frequently asked questions

Do I need special software?

No. All our resources work with standard tools (Excel, Notion, HTML). If you already have your own systems, we integrate with them easily.

Can I adapt the materials to my company?

Yes. Everything is designed to be easily customised with your logo, data and processes. You are not tied to closed software or licences.

Is support or coaching included?

Yes. All kits include a step-by-step guide, and you can extend with mentoring sessions or 90/180-day projects.

What is the difference between kits and projects?

Kits are self-applied and ready to use immediately. Projects involve personalised coaching, KPI tracking and measurable results.

How long until I see results?

With kits: first improvements in 1-2 weeks. With projects: fortnightly milestones with KPIs.

Pricing and way of working?

Kits: fixed price. Coaching: 90/180-day pack with defined scope and deliverables.

Shall we talk about your project?

Tell us what you want to measure or control and your timeline. We propose a 30-min session to frame the case and, if it fits, we send you a 90-day mini-plan with deliverables and price.

We run on-site and remote projects with teams in English and Spanish. Based in Talavera de la Reina; we travel wherever the project takes us.

Email us at proyectos@e2building.com or fill in the form and we will reply as soon as possible.